UNDP
Saoufar
2016
131,171.15 USD
Demolishing and cleaning of site integration of fire surveillance, eletrical system in the existing facility. Installation of tiles, plaster, firerated doors, signs, paint, ugnil flooring. Electrical and mechanical fixationh all to engineer satisfaction