UNDP
Hebarieh-South Lebanon
2016
55,082.50 USD
Work included: excavation, radial reinforcement and pouring of concrete tank elements mechanical fixation of various pipes and valves. Isolation and plastering of tanks walls and slabs paint works as per engineer instructions